Wednesday, September 12, 2007

Sept 12: Starting Work (pic)

Sept 12, 2007, Tasks Accomplished:
  • Disconnected power steering pump from engine
  • Disconnected AC pump from engine
  • Disconnected wire loom from engine and transmission
  • Drained oil and coolant
  • Removed radiator
  • Removed intake system
  • Removed fuel tank and some fuel lines
  • Disconnected coil
  • Removed belts
  • Removed gas tank
  • Removed muffler and catalytic converter

Flickr slideshow


First day of work! The following pictures cronical the initial day of the ICE component removal.