Sept 24, 2007, Tasks Accomplished:
- Finished fabricating front bed battery hold-downs
- Ground smooth edges on brackets
- Clamped brackets in position, then removed bed
- Sanded then welded brackets
- removed engine mounts from engine
- Cleaned engine mounts and installed on tool (wood jig)
- Leveled tool
- Painted new flange brackets
- Reinstalled bed