Monday, September 24, 2007

Sept 24: Grinding and Welding

Sept 24, 2007, Tasks Accomplished:

  • Finished fabricating front bed battery hold-downs
  • Ground smooth edges on brackets
  • Clamped brackets in position, then removed bed
  • Sanded then welded brackets
  • removed engine mounts from engine
  • Cleaned engine mounts and installed on tool (wood jig)
  • Leveled tool
  • Painted new flange brackets
  • Reinstalled bed

Flickr slideshow