Sept 22, 2007, Tasks Accomplished:
- Drilled all-thread holes for battery hold-downs
- Threaded and sized rear all-thread, goes through original bed to frame mounting flange.
- Drilled front all-thread holes
- Drilled and rough-cut frame flanges for front two bed battery hold-down