Oct 2: Finish Hold-down
Oct 2, 2007, Tasks Accomplished:
Finished welds on battery hold-downs
Revamped suspension by swapping the order of the leafs in the rear packs
Cut down all-thread
Welded bolts on all-thread and installed
Spray painted channel-iron runners
Flickr
slideshow
Newer Post
Older Post
Home
About Me
Andy
View my complete profile
Project Timeline
▼
2007
(64)
►
August
(3)
►
September
(20)
▼
October
(31)
Oct 1: Batteries in Bed
Oct 2: Finish Hold-down
Oct 3: New Spring Shackles (pic)
Oct 4: Shackles Still
Oct 5: Start High Voltage
Oct 6: GF Shopping
Oct 7: Stayed in GF (pic)
Oct 8: Conduit
Oct 9: ADAPTOR PLATE
Oct 10: Motor to Tranny
Oct 11: Motor Mounts
Oct 12: Motor in!
Oct 13: Football
Oct 14: Relax
Oct 15: Front Batteries
Oct 16: Air Suspension
Oct 17: Air Is In!
Oct 18: Reinstalling
Oct 19: Torsional Support
Oct 20: In Spokane
Oct 21: Drove back
Oct 22: Got Shrinkwrap!
Oct 23: Controller In
Oct 24: Plexiglass
Oct 25: Charger Email!
Oct 26: Charger Help?
Oct 27: Saturday (pic)
Oct 28: No EV Work (pic)
Oct 29: Low Voltage Wire
Oct 30: Controller Wires
Oct 31: All Batteries
►
November
(3)
►
December
(7)
Parts Specifications
Azure DMOC 455 Controller (pdf)
Azure AC55 Motor (pdf)
US-8VGC Batteries
Battery Amphours (pdf)
Vicor BatMod DC-DC
Canadian EV Power Steering