Oct 18, 2007, Tasks Accomplished:
- Installed Driveshaft
- Picked up tires in GF
- Installed frame brace
- Zip-tied air suspension hosing
- Fashioned two brackets for rear brake lines (needed to move 1/2" because of air suspension)
- Welded and measured rack for controller