Oct 1, 2007, Tasks Accomplished:
- Moved batteries off rubber bed mat
- Installed rubber mat in bed
- Installed bed battery tray in bed
- Moved 36 batteries into position in bed
- Installed new battery hold-down
- Installed new all-thread, bolts, and nuts
- Cut two long steel runners, welded, and installed
- Drilled two cross-runners and installed
- John worked on speakers
- Replaced driver's side rear wheel cylinder